Calendar update

My calendar has been dorked… Currently only future eps and past missing eps are shown. Guessing this was because of an issue with the path to where downloaded eps are stored and they are now missing from the calendar (path has been fixed)

How long should it take for this to repopulate? Rescanning each season does not seem to as instantaneous I would think it would be but not being sure what is happening under the hood here and trying to be patient.

Having not seen any order way really, looks like removal and re import does the trick. But would be open to a method with fewer clicks!

Guess it was time for some house cleaning anyway.

Its because you had Ignore Deleted Episodes on, when drone detected the episodes were gone it removed them from its DB and marked them as ignored.

You could use Season Pass to change the monitored season and then change it back to what you want to actually monitor and it should re-monitor the episodes in the season.

Gonna give a shot, thanks. Only about 1/3 thru what I had so that should help a bunch…

Not sure its needed, but added a refresh after toggling monitor status… Bingo.

Thanks again.

It tends to spit out a bunch of errors doing it this way. But it works…

I get a bunch of;

app.js 38321
TypeError:self.seasons is undefined

drone version 2.0.0.1861?

Sorry. I have been misbehaving. Making to many changes.

it was either 2.0.0.1921 or 2.0.0.1923

Currently on 2.0.0.1925

I might have most of them done.

I going to guess I saw more errors with the increase number of eps that were having to be restored as there were a couple of series that generated quite a few errors and clicking to close them out took some time.

EDIT

I just did a series (with 1925) , Chicago Fire. I checked to unmonitor season 2. Then checked it back to monitor. Then did a rescan of series. Selected the “calendar” , errors stacked on right of screen. I closed 9 errors, but there were 22 eps so not sure there is any connection there or maybe I was just just too fast and getting to calendar before it was done.

EDIT2

I think timing is it, I’m running drone on an ubuntu KVM so it might be just a tad slow. I just did another series and found that if I wanted for the refresh to complete before going to the calendar there were no errors.

I did some looking at the line number doesn’t match anything that would throw that error in any of those versions. If you notice is again, please let us know, along with the version of drone and the full error so we can dig in further.